PROJECT BASICS
DUE TO COVID19 COMPETITION WAS CANCELED. NEXT YEARS TEAM WILL BE ALLOWED TO USE THE SAME RULES AND BRIDGE DESIGN.
Project Location: Cal State Fullerton
pROJECT cONSTRAINTS
The project constraints are detailed in the AISC Student Steel Bridge 2020 Rules provided.This years rules detailed both footings as skewed. Also, the loading combinations and locations are different this year based on the footings.
TASKS
The following tasks are the major tasks needed to complete the scope of work.
Task 1: Research
Task 2: Analysis
Task 3: Shop Drawings
Task 4: Fabrication Management
Task 5: Final Product Improvements
Task 6: Construction Preparations
Task 7: AISC Competition
Task 8: Project Management
Task 9: Impacts
The following information is the Schedule and GANTT Chart. The GANTT Chart details 170 work days. Our critical path is 112 days. The critical path includes the time that the subcontractos, KZELL Metals and Mingus Welding Team. The critical path is crucial to being sure that the team is ready to compete on April 1, 2020. Additionally, the Expected Staffing Hours from the team is below. The table includes a detailed view of the Senior Engineer (SENG), Project Engineer (ENG), Engineer in Training (EIT), Lab Technican (LAB) and the Administative Assistant (AA). The team is expected to spend 1118 hours on this project. Each team member will operate as each of the positions provided.
GANTT CHART 2019
EXPECTED STAFFING HOURS
FINAL STAFFING HOURS
Total Proposed Cost
The total proposed cost is detailed in the table below. This will make up the teams personnel costs, subcontracting, materials and competition logistics. Also, see the billiable rates for each position below.